ANNEXES
CHRONOLOGY OF THE DRAWINGS OF KREMATORIEN II AND III |
|
|
|
|
List as of mid January 1943 of the Bauleitung
drawings produced for the
construction of Birkenau Krematorien II and III
(classified as BW 30 and 30a respectively): |
| 932 |
|
Plan [of basement] (manuscript: in drawer) |
| 933 |
|
Ground floor |
| 934 |
|
Sections |
| 935 |
|
West elevation |
| 936 |
|
North elevation |
| 937 |
|
East elevation |
| 938 |
|
South elevation |
| 980 |
|
Roof frame |
| 1173 |
|
Cross section of the Leichenkeller [1] with the ventilation and air extraction installations |
| 1174 |
|
Cross-section of the basemented area |
| 1301 |
|
Foundation plan (in drawer) |
| 879 |
|
Proposal for the construction of a provisional Krematorium in the POW ramp |
| 1062 |
|
POW camp Krematorium |
| 1300 |
|
Krematorium drainage system |
| 1311 |
|
Correction sheet to basement plan |
| 1341 |
|
Details of doors, dormer windows [not held] |
| 1434 |
|
Construction of chimney for Krematorium [II. Dated 3/6/42. Not held] |
| 1740 |
|
Sketch of former window [not held] |
| 1745 |
|
Krematorium 3 [III] chimney [not held] |
|