The Holocaust Historiography Project
Auschwitz, by J.-C. Pressac
Document 6

Document 5:
[PMO neg. nos 6228, 17809 and 20818/6]
Drawing 934. scale 1:100
Drawn on 27th January 1942 by SS Sergeant Ulmer checked by SS Second Lieutenant Dejaco
and approved by SS Captain Bischofff on
28th January 1942.

Entwurf für das Krematorium / crematorium project.

Schnitt durch Leichenkeller 1, Leichenkeller 2 / cross-sections of corpse cellar 1 and 2.

Translation of inscriptions
(left to right)
Chimney and furnace room section:
· Firsthöhe / ridge height.
· Traufhöhe / gutter height
· Fenstersturzh / window lintel height.
· Fensterbankh / window sill height.
· Sockelhöhe / base height.
· Sockel-Obnerschl. Sandstein / base facing sandstone.
· Gewachsener Boden / natural earth.
· Dachdeckung-Ziegel / tile roof covering.
· Eisenbeton-Hohlkörperdecke / ceiling of reinforced concrete and hollow blocks.
· Betonboden m. Glattstr. / concrete floor with smooth screed.
· Vorlage them HGH [?] / 18mm hard fill.
· Lehmschlag / clay base.
· Erdanschüttung / earth bank.
· Entlüftungskanal / air extraction duct.
· Ofen / furnace.
· Pfeilerfundamente / pillar base.
· Rauchkanal 0.70 x0.60 / smoke flue.
· Türenhöhe! / door heights.
· Saugzuganlage / suction type forced-draught installation.
· Schornsteinfundamente [Nach Baden Belast[un]gsprobe] / chimney foundation [after testing soil strength].
· Rauchkanal-Schieber / flue damper.
· 3 Züge 0.80 × 1.20 / flues.
· Schornstein / chimney.
· Schornstein-Verwahrung / chimney flashing.
· Müllerverbrennungsofen / waste incinerator.
· Betonboden m. Glattstr. / concrete floor with smooth screed.
· Vorlage 20cm HGII [?] / 20cm hard fill.
· Türen- und Fensterumrahmungen — Oberschl. Sandstein! / facing of door and window frames sandstone!
· Gewachsener Boden / natural earth.
Leichenkeller I
· Entlüftungskanal / air evacuation duct.
· Senkrechte Isolierung / vertical damp-proofing
· Isol[ierung] / damp-proofing
· Belüftung / ventilation
· Erdaufschüttung / earth bank.
· Kies / gravel.
· Wasserdichte Abdeckung / water-tight covering.
· Betonboden mit Glattstrich 14cm Stk / concrete floor with smooth screed 14cm.
· Pfeilerfundamente 150 × 150 × 060 Tief / pillar base 150 × 150 × 060 deep.
· Erdanschüttung / earth bank.
· Gewachsener Boden / natural earth.
Leichenkeller 2
(inscriptions translated above not repeated).
· Abwasserkanal / sewer.
· Senkrechte Isolierung / vertical damp-proofing.
· Erdaufsehüttung / earth bank.
· Kies / gravel.
· Wasserdichte Abdeckung / water-tight covering
· Betonboden mit Glattstrich 14cm Stk / concrete floor with smooth screed 14cm.
· Erdanschüttung / earth bank.