| Drawing 1173-1174 (p) |
|
|
|
Translation of inscriptions:
(left to right and top to bottom) |
| Drawing 1174: |
| — |
Erdanschüttung / earth bank. |
| — |
Vorlage / hard fill. |
| — |
Gewachsener Boden / natural earth. |
| — |
Absetzgrube / drainage ditch. |
| — |
Rutsche / [corpse] chute. |
| — |
Belüftung / ventilation |
| — |
Unterzug / joist. |
| — |
Eisenbeton — Bohlendecke / reinforced concrete roof beams. |
| — |
Aufzug / corpse lift. |
| — |
Entlüftung / air extraction. |
| — |
Entlüftungskanal / air extraction duct. |
| — |
Verbrennungsraum / incineration room [furnace room]. |
| — |
Betonboden m[it] Glattstr[ich] / concrete floor with smooth screed. |
| — |
Vorlage 18cm HGH [?] / 18cm hard fill … |
| — |
Gewachsener Boden / natural earth. |
| Drawing 1173: |
| — |
Anschüttung / earth bank. |
| — |
Belüftungskanal vom Dachgeschoss / ventilation duct from roof space. |
| — |
Entlüftungskanal — Verbindung [unter d. N.G. Fussboden] / air extraction duct junction [below new ground level]. |
| — |
Belüftungskanal — Verbindung / ventilation duct junction. |
| — |
Anschüttung / earth bank. |
| — |
Entlüftungskanal zum Dachgeschoss / extraction duct to roof space. |
| — |
Neue Geländehöhe / new ground level. |
| — |
Gewachsener Boden / natural earth. |
| — |
KREMATORIUM — Zutritt verboten / CREMATORIUM — keep out |
|